
10AWG 12AWG Solar Panel Cable Wire & Adaptor for Home, Shop and RV Solar Panels
Accepts OEM. We also can design the cable according to your instructions, the color, specifications, length of our cables and connectors can be customized by the customers.
We can provide the cables as well as connectors linked with the cable;
We adpot select raw-materials, our products are in high quality, competitive prices, prompt delivery.
Extension cords provide power for devices with cables that can't reach any nearby electrical outlets. Choosing the right type of extension cord is important to ensure electrical safety and prevent home fires.
You've probably noticed that most modern high power solar modules are manufactured with wire leads that have solar connectors on the ends. Years ago, solar modules were built with a junction box on the back that required the installer to manually attach wires to the positive and negative terminal posts. This method is still used, but it's slowly becoming a thing of the past. Modern solar modules tend to use the solar connectors because they make wiring your solar array much simpler and faster. The connectors come in both male and female types which are designed to snap together. They meet the requirements of the National Electric Code, they're TUV certified and the preferred connection method of electrical inspectors. Due to the locking mechanism of the solar connectors, they will not come unplugged and are well suited for outdoor environments. The connectors can be separated but it requires a special connector unlocking tool.
Specification | Condstruction (n * mm2) | ||||
2.5mm2 | 4.0mm2 | 6.0mm2 | 10.0mm2 | ||
Rating Voltage: | 1500V | ||||
Conductor | Conductor structure | Class 5 Tinned copper conductor | |||
Material | Tinned copper wire(TXR) | ||||
Number of wires in conductor | 50/0.28 | 56/0.28 | 84/0.28 | 142/0.28 | |
Insulation | Material | Polyolefin copolymer electron-beam cross-linked | |||
Insulation OD(mm) | 3.85 | 4 | 4.6 | 6.5 | |
Color | Black | ||||
Sheath | Material | Polyolefin copolymer electron-beam cross-linked | |||
Sheath OD(mm) | 5.4 | 5.8 | 6.6 | 8 | |
Color | Black/Red | ||||
Max. Resistance AC20oC ohm/ km | 8.21 | 5.09 | 3.39 | 1.95 | |
60oCA Ampacity (60oCA)(A) | 41 | 55 | 70 | 98 | |
Environmetal temperature | -40℃~90℃ | ||||
Application standards | EN H1Z2Z2-K | ||||
Length (Meter) | Optional 1 meters/3 meters/5 meters/10 meters |
Assembly Instructions
During self assembly ,parts and tools other those stated are used or if the preparation and assembly instructions described here are disregarded then neither safety nor compliance with the technical data can be guaranteed.
For protection against electric shock ,PV Connectors must be isolated from the power supply while being assembled or disassembled
The end product must provided protection from electric shock
Unplugging under load:PV plug connections must not be unplugged while under load.They can be placed in a no load state by switching off the DC/AC converter or breaking the AC circuit interrupter.Plugging and unplugging while under voltage is permitted
Disconnected connectors should be protected from dirt and water with sealing caps.
Plugged parts are watertight IP67
Advantage:
• Simple,quick,safe and effective filed assembly
• Develop independently,innovative design,have independent
intellectual property rights,adaptive to connector directly
• High mechanical endurance
• High current and voltage carrying:30A,1000VDC
• Low transition resistance
• Innovative sealed,waterproof,dust resistance design:IP68
• Excellent plastic material ,UL 94-V0,wide temperature range:-40°c
to 90°c,weather and UV resistant for long-time outdoor application
• Approved by TUV
Picture of Solar panel Cable Wire & Adaptor
FAQ:
1. When can I get the quotation?
Within 24 hours of getting the inquiry, if you are very urgent to
get the price, please call us to give complete specifications about
the cable. price will be calculated soon.
2. How long about the delivery?
Usually within 3-4 working days after payment, mainly according to
the quantity.
3. What's your payment terms?
We accept T/T (bank transfer), L/C
4. Do you accept the customized order?
Yes, we do.
5. Do you offer OEM & ODM?
Yes. OEM & ODM are available.
ZHEJIANG PNTECH TECHNOLOGY CO., LTD
ZHEJIANG PNTECH TECHNOLOGY CO. LTD.
It was founded in 2011 and has 10 years of experience in photovoltaic cable production. The company has passed ISO9001 management system certification. The photovoltaic cable series has passed the German TUV and China CQC certification. Certificate covers 1.5sqmm-25sqmm. Our product is produced by special photovoltaic materials, using advanced electron beam irradiation cross-linking technic. Our product can be used for a long time in an environment of minus 40 degrees, and with strong UV resistance. Main Products: Photovoltaic cables, Photovoltaic connectors,PV Junction Box, Solar PV connectors, solar photovoltaic Controllers, PV inverters for solar energy, photovoltaic systems, batteries, etc.
Due to our high quality and good service, our products have been exported to all over the world such as UK, USA, Mexico, Germany, France, Poland, Netherland, Sweden, France, Portugal, Spain, Italy, Australia, Singapore, Malaysia, Thailand, etc.And our products are approved by TUV, CE and ISO9001.
How are we doing it is Skilled , long –term employee , satisfied customers , modern equipment , no-compromise – for – quality values , full range of services , experience , and a sincere commitment to satisfying the requirement of our customers.
Quality product performance and good reputation, our products are not only successful sales in China, and have been exported to more than 120 countries and regions in the world, including: Germany, Japan, Italy, Russia, Japan, South Korea, Turkey, Brazil , India, the United Arab Emirates, Saudi Arabia and other countries, the products are subject to a great welcome and praise.
Our main goal is to conserve the environment through generating clean, sustainable and efficient energy in order to ensure a "greener future” for all mankind. We have the responsibility to increase awareness in renewable energy and assist households and business owners to Go Green and reduce their operational costs.
We attend SNEC in Shanghai every year to show our products to customers all around the world.