Home /

Compact Structure CFB Boiler Header With Large Diameter Welded Pipe

Send your message to this supplier
*From:
Your email address is incorrect!
To:Suzhou orl power engineering co ., ltd
*Subject:
Your subject must be between 10-255 characters!
*Message:
Your message must be between 20-3,000 characters!
Yes!I would like your verified suppliers matching service!
Buy cheap Compact Structure CFB Boiler Header With Large Diameter Welded Pipe from wholesalers
  • Buy cheap Compact Structure CFB Boiler Header With Large Diameter Welded Pipe from wholesalers

Compact Structure CFB Boiler Header With Large Diameter Welded Pipe

Ask Latest Price
Brand Name:ORL Power
Model Number:Customization
Certification:ISO9001/SGS/TUV/ASME/EN
Price:Contact me | Get Latest Price
Payment Terms:L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability:500Ton/Tons per Month
Delivery Time:50~100 Days
Company Data
Active Member
Contact Person Allen Liu
Business Type: 86-512-56770166
Business Type: Manufacturer Exporter Seller
Officials: Zhangjiagang City, Jiangsu, China
Quality: Quality Certifitation Available
Product Details Company Profile
Product Details

Compact Structure CFB Boiler Header With Large Diameter Welded Pipe


CFB Boiler Header Description


CFB Boiler Header, or boiler manifolds are designed to simplify piping near the boiler, reduce installation time, labor costs and parts used. Available in various branch options with threaded inlet and outlet connections. For closed loop heating applications only.

The pressures and temperatures that headers have to withstand depend on the component to which they are connected. A header connected to an economizer or to water wall panels is subject to less severe requirements on the material than a header connected to superheaters or reheaters.


CFB Boiler Header Performance advantage


The key to the manufacture of the header is the welding of the end cap (or head). When welding, most manufacturers use manual arc welding, because the weld is single-sided welding, the root quality is difficult to guarantee, and because of the huge of welding work, number of repairing times, the production cycle is long which cause the entire production process slow. Our company adopt the advanced production technology, well-equipped instrument and sophisticated technology, and invented a submerged arc welding method during the header and cover welding. The character is: In the submerged arc welding machine head threading mechanism fixed connection welding wire guide, along the wire guide head to set the wire guide hole, the wire lead head has a certain degree of curvature, welding the inner wall, the wire guide head extension Into the inside of the welding. The welding method mainly solves the problem that the existing welding method of the boiler header and the end cap (or the head) has the advantages of low processing efficiency, waste of argon at the time of processing, need to open the groove, have many processes, high processing cost and unsatisfactory welding fabrication.


Compact Structure CFB Boiler Header With Large Diameter Welded Pipe

FAQ

1. Why choose us?

We are boiler and boiler parts(boiler drum, boiler waterwall panel, boiler economizer, boiler header, boiler cyclone separator, boiler flue pipe, boiler air preheater, boiler pipe, boiler tube)manufacture and we are one of the best suppliers in China.

We ensure the deliver time, high quality, and the best after-sale service for you.

2. How to order?
Welcome come to our factory for inspecting and discussion the technical details.

Company Profile

Suzhou orl power engineering co ., ltd

 

 

Suzhou ORL Power Engineering Co., Ltd.is located in Suzhou, Jiangsu Province.

ORL Power is a leading company and exporter of industrial boilers,power plant boilersand boiler parts (including steam drum, membrane waterwall panel,header,economizer, evaporator, superheater,H-fin economizer, spiral fin tube, air preheater, heat pipe, flue etc.), seamless steel tubes/pipes and ERW steel pipes.ORL provides our customer with full range of services including boiler design, fabrication, installation and commissioning, boiler maintenance, and supervision at site. Our product and service include design and manufacture industrial boilers, pressure vessels and tanks, and pressure parts for power plant boilers (600MW, or 1000MW).

 

 

 

 

Product Description

Boiler Parts

Boiler Drum,Boiler Waterwall Panel,Boiler Economizer,Boiler Header,Boiler Cyclone Separator,Boiler Chimney Flue Pipe,Boiler Air Preheater,Boiler Air Preheater

Boiler Parts

Boiler Super Heater,Boiler High Temp Superheater,Boiler Cyclone Separator,Boiler Flue,Boiler Heat Pipe Air Preheater,Boiler Gen Bank,Boiler Heat Pipe Elements,Boiler Tube Pin,Boiler Tubeshield,Boiler Ditch Tube

Packaging & Shipping

We have our boiler manufacturing plant, and obtain ISO9001:2008, ISO3834, ASME S, U and GB stamp.

 

Company Business

Our products have been wildly used in power plants and large international companies overseas.

 

Such as USA, Brazil, Porto Rico, Guatemala, Spain, Demark, Norway, Turkey, India, Korea, Australia, Middle East, Southeast Asia etc.

 

FAQ

1. Why choose us?

We are boiler and boiler parts(boiler drum, boiler waterwall panel, boiler economizer, boiler header, boiler cyclone separator, boiler flue pipe, boiler air preheater, boiler pipe, boiler tube)manufacture and we are one of the best suppliers in China.

We ensure the deliver time, high quality, and the best after-sale service for you.

2. How to order?
Welcome come to our factory for inspecting and discussion the technical details.


Contact Information

ADD: Zhangjiagang City, Jiangsu, China

Phone:+86 0512-56770166

E-mail: orl@orlpower.com 

Website: www.boiler-units.com

 

 

 

Send your message to this supplier
*From:
Your email address is incorrect!
*To:

Suzhou orl power engineering co ., ltd

*Subject:
Your subject must be between 10-255 characters!
*Message:
Your message must be between 20-3,000 characters!
Characters Remaining : (0/3000)

You May Like

China High Pressure CFB Boiler Header Steam Boiler Header with ASME wholesale

High Pressure CFB Boiler Header Steam Boiler Header with ASME

China Power Plant CFB Boiler Header / Boiler Low Loss Header High Temperature wholesale

Power Plant CFB Boiler Header / Boiler Low Loss Header High Temperature

China Electrical CFB Boiler Header / Water Header With Natural Circulation wholesale

Electrical CFB Boiler Header / Water Header With Natural Circulation

China Power Station Boiler Header Manifolds Oil Fired Boiler Unit TUV Certification wholesale

Power Station Boiler Header Manifolds Oil Fired Boiler Unit TUV Certification

China Industrial Steam CFB Boiler Header / Low Loss Headers Low Pressure wholesale

Industrial Steam CFB Boiler Header / Low Loss Headers Low Pressure

China Low Pressure Steel Electric CFB Boiler Header Boiler Steam Header Water Tube Structure wholesale

Low Pressure Steel Electric CFB Boiler Header Boiler Steam Header Water Tube Structure

China SA213T11 10 Ton Steel Electric CFB Boiler / Oil Steam Steam Boiler Header 380MW ASTM wholesale

SA213T11 10 Ton Steel Electric CFB Boiler / Oil Steam Steam Boiler Header 380MW ASTM

China ORL Customized Power CFB Boiler Header 500MW Rate Factor Heat Exchanger wholesale

ORL Customized Power CFB Boiler Header 500MW Rate Factor Heat Exchanger

China CFB Heat Exchanger Boiler Ionic , Boiler Header ORL Power ASTM Certification wholesale

CFB Heat Exchanger Boiler Ionic , Boiler Header ORL Power ASTM Certification

China Carbon Steel Power Station Boiler Header With Highly Working Pressure wholesale

Carbon Steel Power Station Boiler Header With Highly Working Pressure

China Customization Steam Distributor , Boiler Manifold Headers For Steam Boiler wholesale

Customization Steam Distributor , Boiler Manifold Headers For Steam Boiler

Inquiry Cart 0